Modified asphalts
THE PROBLEM:
The total length of the project (428 km) was divided into the following sub-sections:
For the traffic volume that this concession will support, the conventional asphalt mix proposed in the initial engineering study did not meet the performance requirements of a beneficial long-term solution. Furthermore, the solution contemplated the placement of a 4 cm thin asphalt layer (thin layer). The project included sections with long transport distances (more than 4 hours), which caused the asphalt mix to cool, resulting in a failure to achieve the desired compaction densities.
THE SOLUTION:
TDM proposed a high-performance solution to the client that offered long-term durability, ensuring the concession’s performance for longer. Polymer-modified asphalt and state-of-the-art warm-mix additives solved the compaction problems.
BENEFITS: